Adding a third floor to a Philadelphia rowhouse

The height limits by zoning district, the setback when both neighbors are two stories, what the party walls have to carry, and the permits a third floor needs.

Where this applies Philadelphia rowhouses. Height limits and setbacks vary by zoning district and overlay. Suburban townships and New Jersey towns set their own rules.

Level Nine Architects · Updated November 4, 2026 · Reviewed by Jared Blake, RA

In RSA-5 and RM-1, two of Philadelphia’s main rowhouse zoning districts, a house can go up to 38 feet, which usually leaves room for a third floor without a variance. Whether yours can depends on three things: the zoning district and any overlay, whether the new floor has to step back from the street, and whether the party walls and foundations can carry it.

How tall can a Philadelphia rowhouse be?

The limit depends on the zoning district:

  • RSA-5 and RM-1: 38 feet.
  • RTA-2: 35 feet and three stories.
  • RSA-6: 25 feet. It can reach 35 feet if the lot is at least 960 square feet, if at least 30 percent of the lots on the block face are empty or have a building of 30 feet or more, or if the owner records an affordability commitment. It can reach 38 feet under the same conditions if the lot has no pilot house or other roof deck access structure.

Overlays can lower these numbers. The Far Northeast overlay, for example, sets 35 feet and three stories on residential lots. A roof deck and a pilot house that meet the roof deck rules don’t count against the limit.

When does a third floor have to step back from the street?

When the lots on both sides have only two stories. In RSA-5, RSA-6, RTA-2 and RM-1, floors above the second then have to sit an additional 8 feet back from the front. Corner lots are exempt. If either neighbor already has a third story, this rule doesn’t apply.

Eight feet is a real loss on a narrow house: about 128 square feet of floor on a 16-foot-wide rowhouse. But the setback can help the design. On Moyer Street in Fishtown, the new floor steps back so the original brick front and cornice still define the house from the sidewalk. A roof deck can’t sit in this setback in RSA-5, RSA-6 or RM-1.

Can the house carry another floor?

That’s a question for a structural engineer, and it should come early. The engineer looks at the party walls, the floor framing and the foundations, then designs whatever the new floor needs to bear on. Structural drawings need an engineer’s seal. When the design calls for special inspections, the permit application needs those forms too.

The party walls usually matter most, because you share them. Under the City’s rules, adding load to a party wall, exposing it, or removing joists from it counts as work affecting the neighbor. Replacing up to 10 percent of the floor joists doesn’t count. When the rule applies, expect:

  • Notice to the adjacent owner. The neighbor’s signature only confirms they received the information. It isn’t their approval. If you can’t get it, the permit can’t be issued sooner than 60 days after the application.
  • A pre-construction survey of the neighboring building by a licensed engineer.
  • A monitoring plan for the neighboring building during construction.

What changes inside the house?

  • The stair. It has to continue up, and it takes room from the second floor. It’s usually the first thing we work out.
  • Bedrooms. Every sleeping room needs an emergency escape opening, so window size and location matter on the new floor.
  • Daylight. A new floor is a chance to bring light into a deep house, with windows front and back and a skylight over the stair.

Three stories is also a code line. Philadelphia’s Residential Code covers houses up to three stories above grade, so a fourth floor moves the project to the Building Code and still has to clear the zoning height limit. On Ellsworth Street in Passyunk Square, the partial fourth floor needed an additional Zoning Board review and was approved as a minor change to the zoning plan.

Which permits does it need, and how long does it take?

An addition that adds space usually needs a zoning permit as well as a building permit. For smaller projects such as an addition to a single-family house, the City can review the two together. Historic buildings and districts also need Historical Commission review.

On our side, concept drawings are usually ready about 3 weeks from the survey, and permit drawings usually take about 3 more weeks after concept approval. Your proposal sets the schedule for your project. L&I’s published review target for one- and two-family work is 15 business days, and comments and resubmissions add time. If the design needs a variance, it is often about four to five months from filing to the hearing in Philadelphia, in our experience, and the decision rests with the Board. See Zoning variances in Philadelphia.

What this means for your project

Send us the address, how many stories the house and each neighbor have now, and a few photos. That usually tells us the height limit and whether the setback applies. The structure takes a site visit and an engineer.

Zoning rules change, and overlays are added often. This guide summarizes the code and the City’s published guidance as of the date above; it isn’t a determination about your property. Ask us what your building allows.

All guides

Next step

Have a question about your property?

Tell us where it is and what you have in mind.