Roof decks in Philadelphia: what the rules allow

Where a Philadelphia roof deck can go, how tall the railing and pilot house can be, which neighborhoods ban them, and what permits and structure a deck needs.

Where this applies Philadelphia homes and apartment buildings. Suburban townships and New Jersey towns set their own rules.

Level Nine Architects · Updated November 4, 2026 · Reviewed by Jared Blake, RA

Philadelphia’s zoning code allows a roof deck on a home or apartment building in every zoning district, as long as it meets the code’s setback and height limits and no overlay for that neighborhood bans it. A deck usually needs both a zoning permit and a building permit, and a deck on an existing roof usually needs a structural engineer.

Is a roof deck allowed on my block?

Usually, but check three things first:

  • Overlays. Some overlay districts ban roof decks and pilot houses outright, including Yorktown, East Poplar, parts of Strawberry Mansion and residential lots in the Far Northeast. City Council has added more of these in recent years, so we check the address against the current code.
  • Historic designation. The Historical Commission reviews rooftop work on designated buildings and in historic districts. More on that below.
  • What the deck sits on. The code doesn’t allow a roof deck on an accessory structure, such as a detached garage. Decks for non-residential uses are prohibited, except by special exception in CMX-3, CMX-4 and CMX-5.

How far back does a roof deck have to sit?

At least 5 feet from the front of the building. If the top floor is already set back 5 feet, the deck doesn’t need a further setback.

In RSA-5, RSA-6 and RM-1 districts, a deck also can’t sit in the front setback the code requires for floors above the second. That setback comes up when both neighbors are two stories tall: see Adding a third floor to a Philadelphia rowhouse.

How high can the deck and railing be?

  • Deck surface. The deck doesn’t count against the building’s height limit if its surface is no more than 48 inches above a plane midway between the lowest and highest points of the roof below it.
  • Railing. Zoning caps a railing at 42 inches. The building code sets the minimum: 36 inches on a one- or two-family house, and generally 42 inches on an apartment building.
  • Privacy screens. A screen can reach 60 inches if it is no more than 50 percent opaque and runs along a side lot line, within 18 inches of it. It can’t run along a street.

How do you get up to the deck?

By a stair and a pilot house: a small enclosure over the top of the stair, with a door onto the deck. The code calls this a “roof deck access structure.” It also allows a hatch, but we don’t see hatches used for decks, because a real stair and a door make a deck much easier to use. The stair has to fit on the floor below, and finding room for it is often the harder part of the design.

A pilot house doesn’t count against the height limit if it meets all of these:

  • It only encloses the stair or elevator. It can’t be a room. Our Wilder Street designs use a pilot house that holds only the stair.
  • It rises no more than 10 feet above the deck surface.
  • It covers no more than 125 square feet, or 165 with an elevator. RM-2, RM-3, RM-4, RMX-3, CMX-3, CMX-4, CMX-5 and IRMX have no area cap.
  • It meets the deck’s setback, and anything more than 42 inches above the deck sits another 5 feet back. In practice, that usually means 10 feet from the front of the building.
  • It sits at least 5 feet from the rear of the building.

What does the structure need?

A deck usually sits on new framing above the existing roof, carried to walls that can take it. A structural engineer sizes it and we coordinate the drawings. Structural work needs the signature and seal of a Pennsylvania-licensed architect or engineer, whatever the cost of the work. When the engineer’s design calls for special inspections, the permit application needs those forms too.

On a rowhouse, those walls are often party walls. Adding load to a party wall counts as work affecting the neighbor, and the City requires notice to the adjacent owner. An engineer’s survey of the neighboring building and a monitoring plan can also apply. The neighbor’s signature only confirms they received the information. It isn’t their approval, but if you can’t get it, the permit can’t be issued sooner than 60 days after the application.

Which permits does a roof deck need?

Usually both a zoning permit and a building permit. The City’s zoning application asks for decks, roof decks and access structures on the site plan. For smaller projects, the City can review the two together. The City’s EZ deck permit, which skips drawings, doesn’t apply. It only covers rear-yard decks no higher than the first floor.

If the design doesn’t meet the rules above, L&I issues a refusal and the next step is an appeal to the Zoning Board. See Zoning variances in Philadelphia. For filing and review times, see How building permits work in Philadelphia.

What if the building is historic?

The guideline the Historical Commission applies asks that rooftop additions and decks be “inconspicuous and minimally visible” from the public right-of-way. In the staff reviews we’ve read, decks on a rear ell tend to meet that more easily than decks on the main block of the house. On Pine Street in Center City, the two new decks sit over the rear wing, and from the street the house looks as it always has.

What this means for your project

Most of this can be answered before anything is drawn. Send us the address, how you get onto the roof today, and a photo of the roof and the houses on each side. We’ll look up the district and any overlay first, because that decides what’s possible.

Zoning rules change, and overlays are added often. This guide summarizes the code and the City’s published guidance as of the date above; it isn’t a determination about your property. Ask us what your building allows.