Converting a Philadelphia rowhouse into apartments

Which Philadelphia zoning districts allow two or more units, how many a lot can hold, when you need a variance, and what the building code changes at three units.

Where this applies Philadelphia. Suburban townships and New Jersey towns set their own zoning and unit rules.

Level Nine Architects · Updated November 4, 2026 · Reviewed by Jared Blake, RA

Whether a Philadelphia house can become two or more units starts with its zoning district. RSA districts, including the common rowhouse district RSA-5, are single-family only, so adding a unit there usually takes a variance. RM-1 allows more than one unit, with the count capped by lot size. At three units, the building code changes too, and that often shapes the project as much as zoning does.

Which zoning districts allow more than one unit?

  • RSD and RSA, including RSA-5: single-family only.
  • RTA-1 and RTA-2: up to two units.
  • RM-1: two or more units, limited by lot area.
  • RM-2, RM-3, RM-4 and RMX: two or more units, with other limits.
  • CMX-2 and CMX-2.5: two or more units, but the ground floor has to hold a non-residential use along the whole front, for the first 30 feet of depth.
  • CMX-3, CMX-4 and CMX-5: apartments are allowed, with other limits. CMX-3 has its own rule for two-family buildings.
  • CMX-1: generally follows the residential district next door.

Overlays can add limits, so we check the address against the current code.

An accessory dwelling unit is a narrow exception to the single-family rule, and it rarely fits a rowhouse. The code allows one on a detached or semi-detached house, including in RSA-5 on a lot of at least 1,600 square feet, and on an attached house only in a historic structure. It has to be inside an existing building, the owner has to live on the property, and outside historic structures it can’t exceed 800 square feet.

How many units can the lot hold?

In RM-1, the count comes from lot area: 360 square feet per unit for the first 1,440 square feet of the lot, then 480 square feet per unit beyond that, rounded down.

  • A 1,080-square-foot lot allows 3 units.
  • A 1,440-square-foot lot allows 4 units.
  • A 1,920-square-foot lot allows 5 units.

CMX-2 uses 480 square feet per unit. That number is a ceiling, not a promise. The building still has to fit the units with stairs, exits and light, and the height and coverage limits still apply.

RM-1 has no minimum parking requirement for homes. RM-2, RM-3 and RM-4 require 3 spaces per 10 units.

What if zoning doesn’t allow it?

It needs a variance from the Zoning Board. We prepare the zoning drawings, and a zoning attorney hired by the owner usually files the appeal and handles the community meeting and the hearing. Jared can join to present the design. In Philadelphia it is often about four to five months from filing to the hearing, in our experience, and the decision rests with the Board. Nobody can promise the outcome. See Zoning variances in Philadelphia.

What changes in the building at three units?

Two units generally follow the rules for one- and two-family houses, including a fire-rated separation between the units: 1 hour under the residential code.

Three or more units is an apartment building under the International Building Code, classified as Group R-2. For a conversion, that usually means:

  • Sprinklers. The Building Code requires them in Group R buildings, and the Existing Building Code decides how that applies when an existing house changes classification. Philadelphia allows the lighter NFPA 13R system in Group R buildings that meet its conditions, including four stories or fewer above grade.
  • Stairs and exits. Under the Building Code, one stair can serve up to four units per story on the first three stories, with sprinklers, escape windows and no more than 125 feet of travel. A fourth story above grade needs two exits.
  • Fire separation. Rated walls and floors between units, and around the shared stair.
  • Engineers. A structural engineer when the work calls for it, and usually an MEP engineer for a multi-family building.

The City’s code officials can meet before you apply to talk through how the code applies, and they can require an evaluation of the existing building by a design professional.

Most of this has to fit inside a narrow house, so the stair usually decides the layout. On Pine Street in Center City, a new shared stair serves five apartments, with fire separation between them and light from both ends of the house. The lowest apartment has an egress window and a light well.

What else does a conversion need?

  • Permits. Adding units usually needs a zoning permit as well as a building permit.
  • Certificate of Occupancy. Changing the number of units can require one.
  • Water and sewer. New service may need a Water Department utility plan, reviewed before the permit application.
  • Historic review. On a designated building or in a historic district, the Historical Commission reviews exterior work. On Pine Street, it reviewed the new windows, doors and masonry.
  • Rental licensing. The owner of a rented unit needs a rental license. A Certificate of Rental Suitability is required for each new tenancy, and the property has to be certified lead-safe or lead-free.

What this means for your project

Send us the address, how many units are there now, how many you have in mind, and what’s on the ground floor today. We’ll look up the district first, because it decides whether this is a permit project or a variance. A zoning attorney advises on the case itself.

Zoning rules change, and overlays are added often. This guide summarizes the code and the City’s published guidance as of the date above; it isn’t a determination about your property. Ask us what your building allows.